Data provided by open.toronto.ca
Building Permit
26 102675 MSA
Application Acceptable
620 DUNDAS ST E
Applied Apr 2, 2026
Project Description
The installation of two 5500 MBH condensing gas-fired boilers, one 1500 ton chiller and cooling towers, and ancillary equipment in the penthouse mechanical room. Additionally, the installation of pressure break heat exchangers in the P1 level, as well as distribution pumps and piping to interconnect with RPEI's existing district energy system.
Permit Details
| Permit Type | Mechanical(MS) |
| Work Type | HVAC: Other Group C Buildings |
| Structure Type | Apartment Building |
| Revision | 01 |
| Ward | S1330 |
| Builder/Owner | N/A |