Data provided by open.toronto.ca
Building Permit
25 151499 DST
Issuance Pending
0 TURNTABLE CRES
Applied Apr 30, 2025
Project Description
Proposal for a Designated Structure - a three level switchback ramp providing connection from Davenport Diamond Greenway Multi-Use Path to Pedestrian CP Bridge crossing.
Permit Details
| Permit Type | Designated Structures |
| Work Type | Other(DS) |
| Structure Type | Other |
| Revision | 00 |
| Ward | S0926 |
| Builder/Owner | N/A |