Data provided by open.toronto.ca

Building Permit

25 151499 DST

Issuance Pending
0 TURNTABLE CRES
Applied Apr 30, 2025

Project Description

Proposal for a Designated Structure - a three level switchback ramp providing connection from Davenport Diamond Greenway Multi-Use Path to Pedestrian CP Bridge crossing.

Permit Details

Permit TypeDesignated Structures
Work TypeOther(DS)
Structure TypeOther
Revision00
WardS0926
Builder/OwnerN/A