Data provided by open.toronto.ca

Building Permit

25 122595 HVA

Revision Issued
800 KIPLING AVE
Applied Jan 22, 2026

Project Description

REV02: Proposed revision for removal of offices and a washroom on the main floor along with the hotelling station and board room on the mezzanine.Rev 01 - Revision to permit 25 122595 HVA 00 MS for removal of offices and a washroom on the main floor along with the hotelling station and board room on the mezzanine.HVAC - Proposed new pre-engineered building primarily to be used as a warehouse interconnected to existing building on site.

Permit Details

Permit TypeMechanical(MS)
Work TypeBuilding Permit Related(MS)
Structure TypeIndustrial
Revision02
WardW0324
Builder/OwnerN/A