Data provided by open.toronto.ca
Building Permit
23 120175 STS
Revision Issued
60 HARBOUR ST
Applied Feb 4, 2025
Project Description
REVISION 02: PROPOSED MINOR CHANGES TO THE RAMP AND OTHER ON-SITE CHANGES Revision 01. Changes to services to line up with Toronto Water and Sewer work on City portion of work.Drain - Proposal to construct a concrete ramp along the west side of the existing commercial building.
Permit Details
| Permit Type | Drain and Site Service |
| Work Type | Inside and Outside Drains |
| Structure Type | Multiple Use/Non Residential |
| Revision | 02 |
| Ward | S1037 |
| Builder/Owner | N/A |