Data provided by open.toronto.ca
Building Permit
21 194129 BLD
Revision Issued
90 QUEEN ST E
Applied Dec 2, 2025
Project Description
Revision 01: changes reflect revisions to the fire protection drawings, including revised FHV locations on ground floor, revised sprinkler layout above the GF Loading Bay, revised sprinkler layout on Level 2, a revised window sprinkler location on Level 10, and revised standpipe piping layout on the MPH Level. Proposal to construct a 34 storey mixed use residential high-rise building consisting of 369 Units together with 3 Levels of U/G Parking with commercial retail at grade and Community Centre on Level 2.
Permit Details
| Permit Type | New Building |
| Work Type | New Building |
| Structure Type | Mixed Use/Res w Non Res |
| Revision | 01 |
| Ward | S1332 |
| Builder/Owner | N/A |