Building Permit
19 247847 PLB
Project Description
REVISION 04: The block originally had eight units, but we have decided to split three double units into six single units. As a result, there are now a total of eleven units in the block. As a result, we are making revisions to the plumbing permit. These revisions will ensure that the new units have the necessary services. Rev 03 - Proposal to change domestic water pipe from copper to stainless steelRevision 02: The submission is to reflect the changes to the 19 247847 PLB 01 PS for Block A. The changes include Blcok A roof plan & sub-grade plan (See drawing M-101A), main servicies (See drawing M-102A), equipment shcedules (see drawing M-801A), additoonal equipment shcedules (see drawing M-802A). Additional bike parking and showers added for Block A.The submission is to reflect the changes to the 19 247847 PLB 01 PS for Block A. The changes include Blcok A roof plan & sub-grade plan (See drawing M-101A), main servicies (See drawing M-102A), equipment shcedules (see drawing M-801A), additoonal equipment shcedules (see drawing M-802A). Additional bike parking and showers added for Block A. to reflect changes of the plumbing systems, to support the construction of a 1 storey underground structure.
Permit Details
| Permit Type | Plumbing(PS) |
| Work Type | Building Permit Related(PS) |
| Structure Type | Industrial |
| Revision | 04 |
| Ward | W0326 |
| Builder/Owner | N/A |