Data provided by open.toronto.ca

Building Permit

22 234805 PLB

Inspection
74 FULTON AVE
Applied Nov 30, 2022

Project Description

Plumbing - Proposal to construct a second floor addition off of the existing master bedroom, new dormer in master bedroom and interior alterations to the ground floor of an existing detached SFD.

Permit Details

Permit TypePlumbing(PS)
Work TypeBuilding Permit Related(PS)
Structure TypeSFD - Detached
Revision00
WardS1424
Builder/OwnerN/A