Data provided by open.toronto.ca
Building Permit
25 242964 ALT
Closed
980 LANSDOWNE AVE
Applied Mar 19, 2025
Completed Apr 24, 2025
Project Description
This proposal relates to the standpipe system in the above-ground components of the Davenport Village Phase 6 residential development at 980 Lansdownw Ave. Deletion of hose cabinets and installation of standpipe risers and 65mm hose connections within exit stair shafts, provision of additional 65mm hose connections outside of exit enclosures, and absence of a fire hose valve in the garabge room in the north end of the ground floor of building C.
Permit Details
| Permit Type | AS Alternative Solution |
| Work Type | Alternative Solution |
| Structure Type | N/A |
| Revision | 00 |
| Ward | S0926 |
| Builder/Owner | N/A |