Data provided by open.toronto.ca
Building Permit
24 253151 DRN
Issuance Pending
2 UNION ST
Applied Dec 23, 2024
Project Description
Drain - New Main Entrance Building, Secondary Entrance Building, Gunns Road Sloped Pathway with two connected Pedestrian Tunnels access to the two Platforms. A new St. Clair Ave West pedestrian sloped pathway access connecting to the St. Clair Ave sidewalk.
Permit Details
| Permit Type | Drain and Site Service |
| Work Type | Building Permit Related (DR) |
| Structure Type | Transit Station,Subway, Bus Terminal |
| Revision | 00 |
| Ward | S0923 |
| Builder/Owner | N/A |