Data provided by open.toronto.ca
Building Permit
24 252253 HVA
Permit Issued
17 DORA AVE
Applied Dec 19, 2025
Issued Feb 2, 2026
Project Description
HVAC - Proposal to provide HVAC systems for the Lower-Level Station Building, Elevators, Mini-hub rooms, and Maintenance Building, including heating, cooling, and ventilation, as well as snow melt systems for passenger platforms.Transit Station - (606.28 m2) lower level entrance with vestibule, 2 stairs and 2 elevators leading to upper track east and west platforms. Covered shelters at platform level. 2 Hub Rooms (26.52m2) at platforms, Maintenance Building (416.61 m2) unoccupied with no public access. Public access to Vestibule at Bloor Street West, to platforms at Dora Ave and Sterling Ave
Permit Details
| Permit Type | Mechanical(MS) |
| Work Type | Building Permit Related(MS) |
| Structure Type | Transit Station,Subway, Bus Terminal |
| Revision | 00 |
| Ward | S0933 |
| Builder/Owner | N/A |