Building Permit

24 175734 ALT

Revision Issued
122 ARROW RD
Applied Mar 15, 2022

Project Description

A TIMED EGRESS ANALYSIS HAS BEEN COMPLETED BASED ON THE SFPE HANDBOOK OF FIRE PROTECTION ENGINEERING, 5TH EDITION, CHAPTER 59, EMPLOYING THE HYDRAULIC MODEL IN ASSESSING EMERGENCY MOVEMENT , TO COMPARE THE ALTERNATIVE SOLUTION TO A THEORETICAL ACCEPTABLE SOLUTION DEVELOPED TO REFLECT THE SAME AVAILABLE EXITS. THE ALTERNATIVE SOLUTION IS CONSIDERED TO BE SUCCESSFUL AS THE ACTUAL CALCULATED EGRESS TIME IS LESS THAN THAT OF THE THEORETICAL DESIGN THAT COMPLIES WITH OBC ACCEPTABLE SOLUTIONS.

Permit Details

Permit TypeAS Alternative Solution
Work TypeAlternative Solution
Structure TypeN/A
Revision00
WardW0728
Builder/OwnerN/A