Data provided by open.toronto.ca

Building Permit

24 115877 STS

Inspection
532 BAY ST
Applied Jul 6, 2015

Project Description

The proposed work is within the Toronto Hydro's Transformer Station. Hydro One is installing a utility tunnel to replace their aging high voltage transmission cable and an access shaft will be housed within the transformer station. To accomodate the installation of the access shaft, the existing storm sewer piping needed to be realigned.

Permit Details

Permit TypeDrain and Site Service
Work TypeSite Service
Structure TypeOther
Revision00
WardS1025
Builder/OwnerN/A