Project Description
Drain - PROPOSED: CONSTRUCTION OF THE IPS SUBSTATION FACILITY STRUCTURE CONSISTING OF A LOWER LEVEL FLOOR HOUSING THE EAST AND WEST ELECTRICAL VAULTS, AND AN OPERATING LEVEL FLOOR HOUSING THE EAST AND WEST SWITCHGEAR ROOMS, PLC AND BATTERY ROOMS, AND TRANSFORMER BAYS. SCOPE OF WORK ALSO INCLUDE ARCHITECTURAL FINISHING AND HARDWARE.
Permit Details
| Permit Type | Drain and Site Service |
| Work Type | Building Permit Related (DR) |
| Structure Type | Other |
| Revision | 00 |
| Ward | S1442 |
| Builder/Owner | N/A |