Data provided by open.toronto.ca
Building Permit
23 195240 HVA
Inspection
64 ST DUNSTAN DR
Applied Mar 29, 2019
Project Description
HVAC Revision 01 - En tier system was revised. Existing one furnace was used instead of three unitsProposal to construct interior alterations, converting sfd into three-unit dwelling.
Permit Details
| Permit Type | Mechanical(MS) |
| Work Type | Building Permit Related(MS) |
| Structure Type | 3+ Unit - Detached |
| Revision | 01 |
| Ward | E2028 |
| Builder/Owner | N/A |