Building Permit
23 187371 ALT
Permit Issued
215 WELLESLEY ST E
Applied Aug 23, 2022
Issued Nov 14, 2022
Project Description
Proposed Alternative SolutionThe proposed development at 215 Wellesley will be provided with a standpipe system. 65 mm fire hose valve connections will be located within the stairs at the main landing for levels above the entrance (30m long hose + m hose steam ). Details of the proposal can be found in the attached alternative solution report.
Permit Details
| Permit Type | AS Alternative Solution |
| Work Type | Alternative Solution |
| Structure Type | N/A |
| Revision | 00 |
| Ward | S1323 |
| Builder/Owner | N/A |