Data provided by open.toronto.ca
Building Permit
23 186281 ALT
Revision Issued
215 WELLESLEY ST E
Applied Oct 6, 2021
Project Description
The proposed development at 215 Wellesley will be provided with a standpipe system. 65 mm fire hose valve connections will be located within the exit stairs at the main landings for levels above the entrance storey. Fire hose station will be provided within the floor area of the main storey to provide the required fire hose coverage (30 m long hose + 3 m hose stream). Details of the proposal can be found in the attached alternative solution report.
Permit Details
| Permit Type | AS Alternative Solution |
| Work Type | Alternative Solution |
| Structure Type | N/A |
| Revision | 00 |
| Ward | S1323 |
| Builder/Owner | N/A |