Data provided by open.toronto.ca
Building Permit
23 136633 BLD
Revision Issued
2972 BLOOR ST W
Applied Jun 13, 2014
Project Description
REVISION#2:Interior + exterior Alterations for existing TD Bank. Revised scope includes a canopy above main entrance and an awning above exterior ATM and Night deposit box. In original scope, there was a canopy above rear entrance, but becasue of the restrictions of existing construction, we need to change it to be an awning. Interior Alterations for the existing TD Bank: construction of new walls, interior finishes upgrades on GF interior finishes upgrade only on 2F and Basement; exterior finishes upgrade
Permit Details
| Permit Type | Building Additions/Alterations |
| Work Type | Interior Alterations |
| Structure Type | Bank |
| Revision | 02 |
| Ward | W0322 |
| Builder/Owner | N/A |