Data provided by open.toronto.ca
Building Permit
23 135832 HVA
Inspection
85 TORO RD
Applied Mar 10, 2022
Project Description
Revision 02: Revision to Mechanical DrawingsRevision 01: A permit revision is required for the project as per the changes in the architectural, structural and mechanical design for the Interior alteration and extension of office space inside the existing industrial space. ropose to construct an interior alteration, underpining a portion of existing basement and extension basement and ground floor
Permit Details
| Permit Type | Mechanical(MS) |
| Work Type | Building Permit Related(MS) |
| Structure Type | Industrial |
| Revision | 02 |
| Ward | N0623 |
| Builder/Owner | N/A |