Data provided by open.toronto.ca

Building Permit

23 135832 HVA

Inspection
85 TORO RD
Applied Mar 10, 2022

Project Description

Revision 02: Revision to Mechanical DrawingsRevision 01: A permit revision is required for the project as per the changes in the architectural, structural and mechanical design for the Interior alteration and extension of office space inside the existing industrial space. ropose to construct an interior alteration, underpining a portion of existing basement and extension basement and ground floor

Permit Details

Permit TypeMechanical(MS)
Work TypeBuilding Permit Related(MS)
Structure TypeIndustrial
Revision02
WardN0623
Builder/OwnerN/A