Building Permit

21 171487 ALT

Closed
99 BLUE JAYS WAY
Applied Dec 7, 2009
Completed Aug 31, 2023

Project Description

Alternative Solution for the proposed development at 99 Blue Jays Way will be provided with a standpipe system. 65 mm hose connections will be located within the exit stairs at the main landings, and on the floor areas where the required 33 m hose coverage cannot be achieved with the hose connections in the stairs. Hose stations will not be provided in the floor areas of the building.

Permit Details

Permit TypeAS Alternative Solution
Work TypeAlternative Solution
Structure TypeN/A
Revision00
WardS1033
Builder/OwnerN/A