Data provided by open.toronto.ca
Building Permit
16 211522 ALT
Closed
176 YONGE ST
Applied Jan 20, 2014
Completed Sep 8, 2020
Project Description
Proposed alternative solution to pressurize the entire volume of the proposed bridge in lieu of pressured smoke control measure N vestibule at one of the bridge and to provide fire safety measures in lieu of a swinging e-gress door in the rolling fire shutter at the TEC end of the bridge.
Permit Details
| Permit Type | AS Alternative Solution |
| Work Type | Alternative Solution |
| Structure Type | N/A |
| Revision | 00 |
| Ward | S1333 |
| Builder/Owner | N/A |