Data provided by open.toronto.ca
Building Permit
21 171843 MSA
Inspection
50 VERNE CRES
Applied Apr 4, 2024
Project Description
Switching the hvac system from electrical baseboard to natural gas force air convectional system. Ducting design and equipment selection.
Permit Details
| Permit Type | Mechanical(MS) |
| Work Type | Boiler/Furnace: SFD/Semi/TH |
| Structure Type | SFD - Townhouse |
| Revision | 00 |
| Ward | E2330 |
| Builder/Owner | N/A |