Data provided by open.toronto.ca
Building Permit
21 171487 ALT
Closed
99 BLUE JAYS WAY
Applied Oct 17, 2024
Completed Oct 22, 2024
Project Description
Alternative Solution for the proposed development at 99 Blue Jays Way will be provided with a standpipe system. 65 mm hose connections will be located within the exit stairs at the main landings, and on the floor areas where the required 33 m hose coverage cannot be achieved with the hose connections in the stairs. Hose stations will not be provided in the floor areas of the building.
Permit Details
| Permit Type | AS Alternative Solution |
| Work Type | Alternative Solution |
| Structure Type | N/A |
| Revision | 00 |
| Ward | S1033 |
| Builder/Owner | N/A |