Data provided by open.toronto.ca
Building Permit
21 150211 ALT
Closed
26 BIRCH AVE
Applied Sep 30, 2021
Completed Mar 10, 2022
Project Description
Proposed alternative soulition is to sprinkler the building to achieve the functional and objectives of Clause 3.3.4.4.(4)(c) as the travel distance within the suite exceeds the required travel distance of 18 m by 6 m.¿. This AS is does not reflect that I agree with the City¿s interpretation of their application of Clause 3.3.4.4.(4)(c), but the AS is an acknowledgment of a method of moving this issue forward with a solution.
Permit Details
| Permit Type | AS Alternative Solution |
| Work Type | Alternative Solution |
| Structure Type | N/A |
| Revision | 00 |
| Ward | S1238 |
| Builder/Owner | N/A |