Data provided by open.toronto.ca
Building Permit
21 119768 HVA
Inspection
81 CLINTON ST
Applied Sep 12, 2011
Project Description
HVAC - Converting a 2 unit dwelling into three units, by proposing front basement walkout for the existing basement suite, A rear two-storey addition and a third storey addition to accommodate the unit on the second floor and create a new unit on the 3rd floor with rear deck
Permit Details
| Permit Type | Mechanical(MS) |
| Work Type | Building Permit Related(MS) |
| Structure Type | 3+ Unit - Detached |
| Revision | 00 |
| Ward | S1133 |
| Builder/Owner | N/A |