Data provided by open.toronto.ca
Building Permit
21 118871 ALT
Closed
85 THE POND RD
Applied May 10, 2023
Completed Nov 25, 2025
Project Description
Combustible composite metal panel system, designated ALPOLIC/FR, an aluminium composite metal (ACM) panel system installed in limited areas on the exterior face of the building which exceeds 6 storeys, will provide the level of performance required by 3.1.5.5.(1) & (2) of the 2021 OBC
Permit Details
| Permit Type | AS Alternative Solution |
| Work Type | Alternative Solution |
| Structure Type | N/A |
| Revision | 00 |
| Ward | W0726 |
| Builder/Owner | N/A |