Data provided by open.toronto.ca
Building Permit
25 107570 PLB
Application Acceptable
580 COMMISSIONERS ST
Applied Mar 27, 2026
Project Description
REV 01: The original design proposed replacing the existing gas-fired MAU and heating units. To align with the City¿s zero-emission requirement, the design has been revised to electric MAU and unit heaters.Plumbing - To install a wheel allignment machine and a wheeltrans bus lift (TTC)
Permit Details
| Permit Type | Plumbing(PS) |
| Work Type | Building Permit Related(PS) |
| Structure Type | Transit Station,Subway, Bus Terminal |
| Revision | 01 |
| Ward | S1443 |
| Builder/Owner | N/A |