Data provided by open.toronto.ca
Building Permit
20 150214 BLD
Inspection
25 ELM ST
Applied Feb 18, 2021
Project Description
Revision 02: Revise breakroom layout and HVAC on 2nd floor.Revision 01: exit path changed at P1 level - previously shown through another door which no longer exist on this level.
Permit Details
| Permit Type | Building Additions/Alterations |
| Work Type | Interior Alterations |
| Structure Type | Apartment Building |
| Revision | 02 |
| Ward | S1145 |
| Builder/Owner | N/A |