Building Permit
20 117890 BLD
Inspection
1 YONGE ST
Applied Sep 1, 2022
Project Description
Revision 02: Revision to main lobby stair and bleacher railings. Architectural drawings were modified to corresspond to the intermittent rail condition in previous correspondence to the building inspector on January 23, 2023.Revision 01 - updated by adding a mid rail to pool area. Mid rail is now added on drawing to match work completed in pool areaProposal for interior alterations for tenant fit out for new Community Centre at 1-7 Yonge St.
Permit Details
| Permit Type | Building Additions/Alterations |
| Work Type | Interior Alterations |
| Structure Type | Multiple Unit Building |
| Revision | 02 |
| Ward | S1038 |
| Builder/Owner | N/A |