Data provided by open.toronto.ca
Building Permit
19 155883 BLD
Inspection
1680 MIDLAND AVE
Applied Jun 17, 2013
Project Description
Proposed Explosion/Fire Damage repair to existing Industrial Unit 16, 17 and 18. Scope of work include removal and replacement of curtain wall to match, temporary shoring to remove the CMU walls, and, reconstruct two wythe masonry wall, remove and replace built up roof membrane.
Permit Details
| Permit Type | Building Additions/Alterations |
| Work Type | Fire Damage |
| Structure Type | Industrial |
| Revision | 00 |
| Ward | E2129 |
| Builder/Owner | N/A |