Data provided by open.toronto.ca
Building Permit
18 218144 MSA
Inspection
1265 MILITARY TRL
Applied Jul 11, 2011
Project Description
Installation of two new hot water heating boilers and subsequent tie-in to existing building perimeter heating. Installation of hot water to glycol heat exchangers and subsequent installation of glycol risers from building central plan (on level 1) to the SWing mechanical penthouse (on level 6). Removal of four existing steam to hot water heat exchangers in SY building mechanical penthouse and replacement with two glycol boilers and two steam boilers.
Permit Details
| Permit Type | Mechanical(MS) |
| Work Type | Alter: Boiler/Furnace/AC Replacement |
| Structure Type | University |
| Revision | 00 |
| Ward | E2532 |
| Builder/Owner | N/A |