Data provided by open.toronto.ca
Building Permit
18 205225 HVA
Inspection
126 BALSAM AVE
Applied Oct 23, 2000
Project Description
HVAC REVISION#1: radiant floor heating installed in basement and main floor; radiators installed on 2nd floor; high velocity cooling system to service main and 2nd floors.HVAC - Proposal to construct 2 storey addition, basement walkout, ground and third floor deck, interior alterations to existing Single Family Dwelling
Permit Details
| Permit Type | Mechanical(MS) |
| Work Type | Building Permit Related(MS) |
| Structure Type | SFD - Detached |
| Revision | 01 |
| Ward | S1939 |
| Builder/Owner | N/A |