Data provided by open.toronto.ca
Building Permit
18 198782 HVA
Inspection
4335 BLOOR ST W
Applied May 11, 2011
Project Description
HVAC - Proposal to construct interior alterations to existing bank including three new Porta Vaults resulting in reconfiguration of the interior layout, floor slab reinforcement, and re build of two existing washrooms at basement level.
Permit Details
| Permit Type | Mechanical(MS) |
| Work Type | Building Permit Related(MS) |
| Structure Type | Bank |
| Revision | 00 |
| Ward | W0233 |
| Builder/Owner | N/A |