Building Permit
25 116160 BLD
Project Description
REV: The revision include the removal of ramp T202 and associated partitions, a revision to a west partition to become exterior wall GB9, a revision to the door schedule, door B06A, to become an insulated door. Structurally, added new details for Ramp T202 demo, new column installation, and slab on grade. Mechanically, expanded demolition and new scope for fire protection, plumbing, and HVAC. Added electrical devices, lighting fixtures, and fire alarm devices to align with the architectural phasing.First phase of the Blue Route Reconfiguration under drawing package UAH102_TW. This includes creating a new 2hr FRR enclosure, a new temporary 1929 wall opening, constructing a temporary accessibility ramp, partially and temporarily removing areas of existing ceiling to move services as required, as well as relocating a firehose cabinet
Permit Details
| Permit Type | Building Additions/Alterations |
| Work Type | Interior Alterations |
| Structure Type | Transit Station,Subway, Bus Terminal |
| Revision | 01 |
| Ward | S1037 |
| Builder/Owner | N/A |