Building Permit
17 253300 HVA
Project Description
REVISION 1: The scope of this revision includes demolition of specific areas on Level 29. Construction scope includes erection of non-loadbearing partitions, the re-alignment and distribution of electrical, mechanical and life-safety systems, as well as the construction of a convenience stair connecting all three levels 29th, 30th and 31st. .HVAC - Interior tenant alterations for single tenant. The scope of this project includes demolition of specific areas on Levels 30 and 31. Construction scope includes erection of non-loadbearing partitions, the re-alignment and distribution of electrical, mechanical and life-safety systems. A permit revision will include the demolition and interior alterations on Level 29, as well as the construction of a convenience stair connecting all three levels.
Permit Details
| Permit Type | Mechanical(MS) |
| Work Type | Building Permit Related(MS) |
| Structure Type | Multiple Unit Building |
| Revision | 01 |
| Ward | S1337 |
| Builder/Owner | N/A |