Data provided by open.toronto.ca
Building Permit
17 180929 HVA
Inspection
59 BOYD AVE
Applied Aug 27, 2018
Project Description
Revision 1. changing the heating and cooling system in the house from radiant heat (boiler) to forced air (furnace). We are amending our previous hvac plans and replacing them with the attached plans to install forced air throughout the house.
Permit Details
| Permit Type | Mechanical(MS) |
| Work Type | Building Permit Related(MS) |
| Structure Type | SFD - Detached |
| Revision | 01 |
| Ward | W0525 |
| Builder/Owner | N/A |