Data provided by open.toronto.ca
Building Permit
15 203457 PSA
Closed
104-110 BARTLEY DR
Applied Feb 9, 2018
Completed Dec 29, 2020
Project Description
Revision - Engineer drawings with 2" backflow preventer on a 2 1/2" lineProposal to install a DVCA back flow prevention device in the existing industrial building (warehouse and storage).
Permit Details
| Permit Type | Plumbing(PS) |
| Work Type | Backflow Prevention Devices (Water only) |
| Structure Type | Industrial |
| Revision | 01 |
| Ward | N1631 |
| Builder/Owner | N/A |