Data provided by open.toronto.ca

Building Permit

15 203457 PSA

Closed
104-110 BARTLEY DR
Applied Feb 9, 2018
Completed Dec 29, 2020

Project Description

Revision - Engineer drawings with 2" backflow preventer on a 2 1/2" lineProposal to install a DVCA back flow prevention device in the existing industrial building (warehouse and storage).

Permit Details

Permit TypePlumbing(PS)
Work Type Backflow Prevention Devices (Water only)
Structure TypeIndustrial
Revision01
WardN1631
Builder/OwnerN/A
Permit 15 203457 PSA at 104-110 BARTLEY DR | TorontoPermits