Building Permit
23 231251 HVA
Project Description
Revision 01:1.Ductless Unti Capacity Adjustment ¿ the ductless unit was changed from 6 MBH to 9 MBH, as the wall between the bedroom and the kitchen was removed, creating and open-concept space. Previously, electric baseboards were used in this area; ductless unit now provides heating and cooling for the entire space. 2.Washroom layout ¿ The washroom layout has been revised.3.Garage Separation from basement entry ¿ a Dimplex electric baseboard has been added to the new entry hall.4.ERV Addition- A new ERV has been added on the second floor, along with associated ductwork.5.Indoor Unit Relocation- Indoor unit IU-3 has been installed on the wall between the Office and Hall (open space). The previously installed electric baseboard in this zone has been removed.6.Bedroom 3 Modification- the previous indoor unit has been removed. Two new electric baseboards have been installed side by side to cover the load.7.Master Bedroom Layout ¿ the master bedroom layout has been modified.8.Ensuite Bathroom Skylight- A new skylight has been added to the ensuite bathroom.HVAC - Proposal for interior alterations, third floor addition, and construct a roof deck in proposed duplex. See also 23 189131 ZAP.
Permit Details
| Permit Type | Mechanical(MS) |
| Work Type | Building Permit Related(MS) |
| Structure Type | 2 Unit - Semi-detached |
| Revision | 01 |
| Ward | S1436 |
| Builder/Owner | N/A |