Data provided by open.toronto.ca
Building Permit
12 248061 PSA
Inspection
100 IRON ST
Applied Nov 4, 2020
Project Description
To install 2 Backflow Prevention Devices to an existing warehouse, to a ground floor area, to 2 separate Water Meters located at 2 separate Water Meter rooms.
Permit Details
| Permit Type | Plumbing(PS) |
| Work Type | Backflow Prevention Devices (Water only) |
| Structure Type | Warehouse |
| Revision | 00 |
| Ward | W0133 |
| Builder/Owner | N/A |