Data provided by open.toronto.ca
Building Permit
09 174823 BLD
Inspection
55 FRONT ST W
Applied Aug 29, 2022
Project Description
REVISION 5: This is a revision to the shoring project for Phase 4A and 4C South along with 4D North shoring plans prepared by Stephenson Engineering. NOTE: additional scope added to revision on Nov 25/11 - Phase 8 South Shoring.
Permit Details
| Permit Type | Building Additions/Alterations |
| Work Type | Multiple Projects |
| Structure Type | Transit Station,Subway, Bus Terminal |
| Revision | 05 |
| Ward | S1037 |
| Builder/Owner | N/A |