Data provided by open.toronto.ca

Building Permit

09 174823 BLD

Inspection
55 FRONT ST W
Applied Aug 29, 2022

Project Description

REVISION 5: This is a revision to the shoring project for Phase 4A and 4C South along with 4D North shoring plans prepared by Stephenson Engineering. NOTE: additional scope added to revision on Nov 25/11 - Phase 8 South Shoring.

Permit Details

Permit TypeBuilding Additions/Alterations
Work TypeMultiple Projects
Structure TypeTransit Station,Subway, Bus Terminal
Revision05
WardS1037
Builder/OwnerN/A
Permit 09 174823 BLD at 55 FRONT ST W | TorontoPermits